Utility

Goodwin-Rollout

Goodwin Rollout

Locations: Various sites across the ACT

Total Solar Installed: over 1MW in progress (Goodwin Ainslie site – 477kW)

Products used:  SunPower and Trina Solar Panels / SMA and SunGrow Inverters

CSIRO-Rollout

CSIRO Rollout

Locations: 3 sites across ACT and VIC

Total Solar Installed: 500kW

Products used:  SunPower and Trina Solar Panels / SMA Inverters

DOMA-Rollout

DOMA Rollout

Locations: 3 sites in the ACT – Hotel Realm, Burbury Hotel, Little National Hotel

Total Solar Installed: 259.09kW

Products used:

Site 1: Trina Solar Panels SolarEdge SMA Inverters.

Site 2 and 3: SunPower Solar Panels with SolarEdge Inverters.

Questacon-National-Science-and-Technology-Centre

Questacon – National Science and Technology Centre

Location: Canberra

System Size: 126kW

Products used:  Winaico Solar Panels and SMA Inverters

Cricket-ACT-AFL-Canberra

Cricket ACT/ AFL Canberra (Phillip Oval Management Group)

Location: Canberra

System Size: 65.6kW

Products used:  SunPower Solar Panels with a SunGrow SG50CX Inverter

Fun Fact: EPC Solar have sponsored Cricket ACT and AFL Canberra and Phillip Oval was renamed EPC Solar Park.